CM-08 System Component Inventorycm-8
Whether an AWS call fetches evidence for this control, and what to run. Its Rev5 baselines, the indicators that reach it and the FedRAMP guidance attached to it open below.
Partial1 of 1 recipe reaches CM-08, and none is rated full — the output narrows the question, a human judgement closes it.
AWS Config · AWS Systems Manager Inventory1 recipe · 5 calls
Collect evidence (1)
Authored AWS recipes whose output is evidence for CM-08. This mapping is this project’s opinion (overlay v3.0.0), versioned separately from the dataset — the upstream FedRAMP rules name none of these tools.
What NIST requires of CM-08
The control statement from NIST 800-53 Rev5, verbatim. Square brackets are organization-defined parameters — yours to set, not FedRAMP's to dictate.
a. Develop and document an inventory of system components that: 1. Accurately reflects the system; 2. Includes all components within the system; 3. Does not include duplicate accounting of components or components assigned to any other system; 4. Is at the level of granularity deemed necessary for tracking and reporting; and 5. Includes the following information to achieve system component accountability: [information]; and b. Review and update the system component inventory [frequency].
NIST SP 800-53 Rev5 catalog 5.2.0, from usnistgov/oscal-content at 78650f0. The FedRAMP dataset carries no control text; this is borrowed and pinned.
Rev5 baseline membership
Membership is the whole relationship — a baseline is a set of control ids. Class A carries no baseline at all. The Low/Moderate/High labels are an interpretation from control counts, not a dataset fact.
KSI indicators reaching this control (1)
Under 20x, these indicators are how this control is demonstrated — automated KSI evidence stands in for narrative control evidence.
FedRAMP guidance & parameters
Where you read the rule. Guidance names an FRR document, never a clause, so the links below offer the whole document and leave the reading to you.
- Follow the FedRAMP Continuous Collaborative Monitoring, Significant Change Notification, Vulnerability Detection and Response, and Vulnerability Evaluation and Reporting rules.This guidance points at the Collaborative Continuous Monitoring rules (CCM, 19 requirements).This guidance points at the Significant Change Notification rules (SCN, 17 requirements).This guidance points at the Vulnerability Detection and Response rules (VDR, 18 requirements).This guidance points at the Vulnerability Evaluation and Reporting rules (VER, 23 requirements).
Pages exist for the 209 controls reached by at least one KSI. Baseline-only controls are the orphans on /coverage. Control titles and full text live in the NIST catalog, not this dataset.